Water Intrusion Projects
Project 1
Biological growth and ceiling water bubbles were discovered due to water intrusion. The area was contained and prepared for treatment. The damaged drywall was removed and a dehumidifier utilized. The final result is lumber and metal pieces free of biological growth.
Project 2
The first step was to check for the presence of moisture using a moisture meter. The FLIR camera confirmed the presence, location, and extent of the moisture. The wet drywall was removed and biological growth on the lumber was discovered. A containment was installed prior to the removal of the mold and installation of new lumber and drywall.
Project 3
Moisture was detected using the moisture meter. Drywall was removed in order to determine the location of the leak. The biological growth/mold was removed from the drywall and insulation, and the walls were finished with new drywall.
Project 4
Major water damage on the existing balcony. Remodel of structure to eliminate the balcony and add additional space to the home. Issues included the redesign of a new roofline.